Progress
Current status
processing consultation
03 Sep 2025processing consultation
13 Aug 2025in consultation
Scope
Implementers
Nigeria
Policy Area
Authorisation, registration and licensing
Policy Instrument
Operational license requirement
Regulated Economic Activity
infrastructure provider: network hardware and equipment
Government Branch
executive
Government Body
other regulatory body
Implementation Level
national
Timeline of events
Nigerian Communications Commission closes consultation on use of 5925 – 6425 MHz band, including operational license requirement
On 3 September 2025, the Nigerian Communications Commission closes the consultation on the use of the 5925 – 6425 MHz band. The 5925–6425 MHz band, is a portion of the radio frequency spectrum allocated for high-speed, license-free Wi-Fi and other w…
- Draft Regulatory Guidelines for the use of the lower part of the 6 GHz (5925 – 6425) MHz band in Nigeria, Nigerian Communications Commission (NCC) (Official)
Nigerian Communications Commission opened consultation on use of 5925 – 6425 MHz band, including operational license requirement
On 13 August 2025, the Nigerian Communications Commission opened a consultation on the use of the 5925 – 6425 MHz band, until 3 September 2025. The 5925–6425 MHz band, is a portion of the radio frequency spectrum allocated for high-speed, license-fr…
- Draft Regulatory Guidelines for the use of the lower part of the 6 GHz (5925 – 6425) MHz band in Nigeria, Nigerian Communications Commission (NCC) (Official)